Chain surveying problems pdf

Chain survey procedure, applicability, survey stations and. Instruments used in chain survey chain used for surveying. Although they are constructed for rugged field conditions, the mechanical components and electronics of precision instruments can be damaged by careless acts or inattention to the procedures for use, care and adjustment of the instruments. In chain survey, only measurements are taken in the field, and the rest work, such as plotting calculation etc.

It is the art of measuring horizontal and vertical distances between objects, of measuring angles between lines, of determining the direction of lines, and of establishing points by predetermined angular and linear measurements. Measurement of distance on ground with the help of chain is known as chaining. Compensating errors are said to be accidental errors hence cancel out and does not pose serious problem to the accuracy of the survey. It is a method of surveying in which the area to be divided into a number of triangles. Plane table survey principles, advantages and disadvantages, equipment, accessories and their uses. This is most suitably adapted to small plane areas with very few details. What are the obstacles in chain survey and methods to. Problem 2 the base line ac of a chain survey is measured and the following. Types of chains used in surveying, their parts, testing and. Camp instructor civil engineering, purdue land surveying problems confronting the land surveyor might well be placed in two general classifications. This is suitable for the survey of small areas with simple details and an area that is fairly flat. Categories surveying tags arrows, arrows used in chain surveying, chain, chain survey, chain surveying, field work in chain survey, guide to chain surveying, guide to surveying and levelling, instruments used in chain survey, iron pegs, marking stations, ranging rods, reconnaissance survey, surveying in civil engineering, tape, wooden pegs in. This problem of solving obstacles can best be explained. Problems in ranging and chaining of a line chain surveying.

Instruments used in chain surveying iamcivilengineer. As you are about to execute chain surveying so chain is the requisite tool that is a must. Principle of chain surveying, surveying and levelling. Chandra book surveying problem solving with theory and objective type questions by dr. Going through these numericals will actually give you an idea as to how the calculations are done inspite of errors occurring in the chain surveying.

It is the exercise of physically measuring horizontal distances. In this method thelengths of lines marked on the field are measured, while the details are measured byoffsets and ties from these lines. Chain surveying is suitable for small areas with few details. Jun 16, 2015 chain surveying, it is a method of surveying in which no angles are measured but only linear measurement is taken in the field by using a chain or tape measure. Types of chains used in surveying, their parts, testing and advantages chains are the measuring instrument used in surveying formed by the 100 links of 4mm galvanized mild steel wire. Surveying traverse surveying traverse distance traverse methods of computing area a simple method that is useful for rough area estimates is a graphical method in this method, the traverse is plotted to scale on graph paper, and the number of squares inside the traverse are counted a d c b distance traverse methods of computing area a c. Based on this, the principle of chain surveying is to divide the area to be surveyed into a network of connected triangles.

Surveying is a very important part of civil engineering. Surveying is an art of determining the relative positions of various points on, above or below the surface of the earth by means of direct or indirect measurement of distance, direction and elevation. Pdf surveying problem solving saied albayya academia. Surveying multiple choice questions and answers pdf free download for freshers civil engineering students. Surveying lab ii manual department of civil engineering b. Pdf surveying problem solving with theory and objective. Here you can download the free lecture notes of surveying pdf notes, materials with multiple file links to download. Trigonometric leveling heights and distance problem two exercises 4. Chain surveying, it is a method of surveying in which no angles are measured but only linear measurement is taken in the field by using a chain or tape measure. When the rear end of chain comes to the arrow fixed to the leader, the follower holds the rear end of handle at that point. Viewer has to keep in mind that this video only shows the basics of chain surveying observation in field, it also. It measured one chain by one furlong totaling 10 square chains.

Demonstration of chain surveying related to field work and office work. It is the art of measuring horizontal and vertical distances between objects, of measuring. A field engineer has measured the distance between column lines with a chain which is later discovered to be too short. The three main obstacles in chaining of a line are of the following types. The length of a survey line was measured with a 20 m chain and was found to be equal. Surveying traverse group example problem 1 surveying traverse balancing the latitudes and departures of a traverse attempts to obtain more probable values for the locations of the corners of the traverse a popular method for balancing errors is called the compass or the bowditch rule. Here in we have gathered some pdf lectures on surveying. Types of chains used in surveying, their parts, testing. Jun, 2012 in chain surveying only linear measurements are made i. Tools and equipments required include chain, tape, ranging rod, arrows and, sometimes, a cross staff. Chapter 3 surveying equipment, measurements and errors. It can be done by forming a right angled triangle by taking three sides of a triangle in the proportion of 3, 4 and 5. Chain surveying is the type of surveying in which only linear measurements are made in the.

Aug 08, 2018 as you are about to execute chain surveying so chain is the requisite tool that is a must. Technical terms used in chain surveying survey stations these are important point fixed on ground indicating the starting point and the end point of the survey line. Going through these numericals will actually give you an idea as to how the calculations are done inspite of errors occurring in the chain surveying correction due to incorrect length of chain. It sometimes happens that a survey line passes through some object such as a pond, a building, a river, a hedge etc. Surveyors chain, also called gunters chain, measuring device and arbitrary measurement unit still widely used for surveying in englishspeaking countries. To erect, with a tape, a perpendicular to a chain line from a point on it.

In order to determine the actual distance between points, how should the correction be applied. Chain tape surveying is the simplest form of detail surveying. Field work in chain survey surveying in civil engineering. Instruments used in chain survey chain, 20m or 30m long tape arrows ranging rods wooden or iron pegs plumb bob cross staff chain used for surveying 20m chain 100 links 30m chain 150 links 1 links 20cm links of chain are made by mild steel wire 4mm diameter. Math problems may be used to assess students knowledge regarding bearings. Surveying notes pdf book starts with the topics distance measurement conventions and methods, theodolite, description, uses, and adjustments. It measures a series of straight lines on the ground with a chain or tape measure and all fixed points relative to the line of traverse either by right angles offsets or tie lines. Apr 02, 2020 principle of chain surveying, surveying and levelling agricultural engineering notes edurev is made by best teachers of agricultural engineering. If carefully done, it gives quite accurate results. It is necessary that the chain should be laid out on the ground in a straight line between the end stations. Hence chain surveying is some times called chain triangulation. We will now move on with different numerical problems on the concept of errors in chain surveying. Proper care in the use, storage, transportation and adjustment of the equipment is a major factor in the successful completion of a survey.

Gunters chain also known as gunters measurement is a distance measuring device used for surveying. To survey an area by chain survey across obstacles and to calculate the obstructed lengths by using different methods. The rectangle is the simplest fig that can be plotted from the lengths of its sided. Because of its ease of use, it is used during reconnaissance survey as a quick method of surveying to get a rough idea in the location to be surveyed.

The chain survey is preferred when the ground is nearly flat and open and also when the area to be surveyed is smaller. Sep 09, 2016 demonstration of chain surveying related to field work and office work. They arise as a result of not being perfect in the use of the equipment or in the whole survey process. Surveying this page intentionally left blank surveying dr a m chandra prof. In this method, the lengths of lines marked on the field are measured, while the details are measured by offsets and ties from these lines. Keeping the arrow in the same position, the leader pulls the chain for measuring the further distance. Numerical examples for chain surveying errors in surveying civil. Pdf ce6304 surveying i books, lecture notes, 2marks with. Chain surveying definition, details, procedure civil. Chain survey is the simplest and commonest method used in surveying exercises. Problems in ranging and chaining of a line chain surveying surveying. Firstly, inspect the area to be surveyed and prepare key plan.

Compass surveying principles use of prismatic compass, measurement of. Chain and compass traverse may be run for ordinary surveys. Feb 11, 2017 the chain survey is preferred when the ground is nearly flat and open and also when the area to be surveyed is smaller. Numerical examples for chain surveying errors in surveying. In chain surveying the sides of the triangles which should be well conditioned. The whole area is then plotted on a drawing sheet to a suitable scale to prepare a map. This volume is one of the two which offer a comprehensive course in those parts of theory and practice of plane and geodetic surveying that are most commonly used by civil engineers. Chain surveying is the branch of surveying in which only linear measurements are made in the field. The main principle of chain surveying or chain triangulation is to provide a framework consist of number of wellconditioned triangles or nearly equilateral triangles. In measuring the length of survey line also called as chain line. Heights and distance using principles of tacheometric surveying two exercises 5. In chain surveying, the positions of main stations and directions of main survey.

Since triangle is the only figure that can be plotted with measurement of sides only, in chain surveying the area to be surveyed should be covered with a network of triangles. Chain survey method for performing chain surveying how to. In chain survey, only measurements are taken in the field, and the rest work, such as. It is a basic course for all universities for civil engineers. In this survey only measurements are taken in the field, and the rest work, such as plotting calculation etc. Compass surveying principles use of prismatic compass, measurement of bearings, conversion of bearings, local attraction, correction of compass traverse. May 04, 2017 for the love of physics walter lewin may 16, 2011 duration. The first volume covers in 24 chapters, the most common surveying operations. By extension, chainage running distance is the distance along a curved or straight survey line from a fixed commencing point, as given by an odometer. Then, mark stations using suitable means such as fixing ranging poles, driving pegs, and digging and fixing a stone.

The lengths of the sides are measured and the interior details are recorded. This means that the area to be surveyed is divided into a number of small triangles which should be well conditioned. It was designed and introduced in 1620 by english clergyman and mathematician edmund gunter 15811626. The chain is a unit of length equal to 66 feet 22 yards. We hope students all over the world will find it helpful. In chain surveying the sides of the triangles are measured directly on the field by chain or tape, and no angular measurements are taken. In this case ad is the longest and a chain line running from a to d is laid.

There are 10 chains in a furlong, and 80 chains in one statute mile. The chain surveying is the most commonly used surveying for quick and short measurements. Download surveying problem solving with theory and objective type questions by dr. Construction surveying and layout, 3rd edition chapter chain corrections questions and problems 1. Dec 02, 2015 follower holds the zero end of the chain and the leader fixes up an arrow at the end of one chain length. Each topic introduced is thoroughly described, the theory is rigorously developed, and a large number of numerical.

A chain is made up of steel or galvanized mild steel wire which is divided into straight links and tags rings to facilitate folding and for ease in storage. Offsets to corner points b, c, e and f are now laid from the chain line ad either by tape or crossstaff and their foot of offsets are g, i, j, h respectively. It enabled plots of land to be accurately surveyed and plotted, for legal and commercial purposes. The length of the traverse legs are measured by chaintape or by stadia method. Chains are the measuring instrument used in surveying formed by the 100 links of 4mm galvanized mild steel wire. For example, if the pull exerted on the tape in either more than or less than what should be the case, faulty results be gotten. This is most suitable adapted to small plane areas with very few details. After participating in this fieldwork students will become more comfortable with handling chain and ranging rods. To survey an open field by chain survey in order to calculate the area of the open field. Surveying civil engineering questions and answers gate.

Chain survey procedure, applicability, survey stations. When a three point problem resorted to in plane table surveying. A chain is mainly used in chain surveying to measure the distances. Duties of the follower and leader during chain surveying. Enrol today in our site and get access to our study package comprising of video lectures, study material, practice questions and.

Early twolane roads were laid out with a chain, resulting in a 66ft. Let ab be the chain line and c a point on it at which it is. Every aspect of the life requires some measuring units. This article throws light upon the six major problems in ranging and chaining of a line. The principle of chain surveying is to provide a skeleton framework of straight lines, which can be plotted to scale if the lengths of these lines are predetermined either with a chain or a surveying tape. Chain surveying is the type of surveying in which only linear measurements are made in the field. What are the obstacles in chain survey and methods to correct it. In this type of surveying, survey stations main stations, tie or subsidiary stations shall be specified carefully otherwise the outcome of the surveying process may not be accurate.

This document is highly rated by agricultural engineering students and has been viewed 10201 times. These links are joined by 3 circular or oval wire rings. Surveying instruments are designed and constructed to provide years of reliable use. The duties of the follower chain man at the rear end of the chain are. Invented by the english mathematician edmund gunter in the early 17th century, gunters chain is exactly 22 yards about 20 m long and divided into 100 links. Ibrahim mahamid civil engineering department, engineering faculty, university of hail, ksa. Practicing all surveying civil engineering questions and answers in online helps you to improve your ability to attend the real time gate, ies and bsnl jto exams.

1338 1499 1142 1160 1331 1437 585 825 443 543 590 803 604 104 1143 1047 1448 703 1486 1166 1113 588 550 1163 249 795 1176 1503 113 1480 1485 109 824 613 21 542 494 1412 337 210 992 79 191 482 212